Star-delta starter on a PLC with a TON timer
The relay star-delta starter uses a timer relay to switch the motor from star to delta. On a PLC the timer is an instruction: TON (on-delay timer). This tutorial programs the full sequence on a Siemens S7-1200 in Virtuino Circuits, including a short pause between star and delta, which is hard to do with relays but easy in a PLC.
Open the ready-made circuit in the simulator
I/O list
| Address | Device |
|---|---|
| %I0.0 | S0 Stop (NC) |
| %I0.1 | S1 Start (NO) |
| %I0.2 | F2 Overload 95-96 (NC) |
| %Q0.0 | K1 Main contactor |
| %Q0.1 | K2 Star contactor |
| %Q0.2 | K3 Delta contactor |
Wiring
- Draw the power circuit of the star-delta starter: K1 to U1 V1 W1 through the overload relay, K3 to W2 U2 V2, and K2 as the star point. Use the 6-terminal three-phase motor.
- Place the PLC (S7-1200 CPU 1214C), supply it from L1/N and wire the inputs from 24 V DC.
- Wire the outputs: .0 → coil K1 → N; .1 → coil K2 → K3 21-22 → N; .2 → coil K3 → K2 21-22 → N. The NC contacts are the hardware interlock between star and delta.
Ladder program
Rung 1 – Main contactor (start/stop with seal-in)
%I0.1 %I0.0 %I0.2 %Q0.0
|-----| |---+------| |-----| |-------------------------( )---|
%Q0.0 |
|-----| |---+
Rung 2 – Star time
%Q0.0 T1: TON PT = 5 s
|-----| |---------------------------[IN Q]-------|
Rung 3 – Changeover pause
T1 T2: TON PT = 0.1 s
|-----| |---------------------------[IN Q]-------|
Rung 4 – Star
%Q0.0 T1 %Q0.2 %Q0.1
|-----| |-----|/|-----|/|------------------------------( )---|
Rung 5 – Delta
%Q0.0 T2 %Q0.1 %Q0.2
|-----| |-----| |-----|/|------------------------------( )---|
- Rung 1 is the start/stop seal-in for the main contactor.
- Rung 2. From the timers group place a TON. In its properties give it the name T1 and PT = 5 s. Its input is the main contactor output. While K1 is on, T1 counts; after 5 s its output Q becomes 1.
- Rung 3. A second TON named T2, PT = 0.1 s, started by a contact T1. Contacts with a timer's name follow its output Q.
- Rung 4. Star = main on AND T1 not yet done AND delta off.
- Rung 5. Delta = main on AND T2 done AND star off.
Why the pause? Inside one PLC scan, rung 4 switches star off and rung 5 could switch delta on immediately. Real contactors need a few tens of milliseconds to open and extinguish the arc. If K3 closed while K2 was still arcing, there would be a phase-to-phase short circuit. T2 gives K2 100 ms to open first. The hardware interlock is still needed as a second barrier.
Simulate
- Press
F5and open the Ladder window. Click S1. - K1 and K2 pull in, the motor starts in star. In the Ladder window the TON box shows the elapsed time ET counting up to 5 s.
- At 5 s, star drops out; 0.1 s later delta pulls in. The motor symbol changes from star to delta.
- Press S0: all outputs go off and both timers reset to 0, ready for the next start.
- Use ×10 on the floating bar to speed up the clock, or set a longer PT to watch the changeover slowly.
Ideas to extend it
- Add a lamp that flashes during the star phase and stays on in delta.
- Count the starts with a CTU counter, see the counter tutorial.
- Write the same program for LOGO! (I1, Q1, timer block with On-Delay) by changing the PLC model; the rungs stay the same, only the addresses change.